|
Build Your Online Product Catalogs?
Product Name: |
Vibratory hammer
|
Supply Ability: |
|
Related proudcts |
|
Specifications |
Vibratory hammer |
Price Term: |
Telephone discussion or an interview |
Port of loading: |
|
Minimum Order |
|
Unit Price: |
|
|
Hydraulic vibration hammer range of applications: Large diameter excavation, construction of large-scale and large-scale steel pipe pile casings construction projects, soft ground and rotary drilling rig construction projects with high-speed railway roadbed construction and infrastructure projects around the sea Reclamation projects and governance in the sand pile construction, municipal construction projects, pipeline construction, sewage treatment and support retaining works, such as the fight or pull a variety of materials and shapes of the pile, such as steel piles, concrete piles, rail pile, iron, H plate, drainage pipes. Vibratory hammer electric hammer and contrast the advantages and disadvantages: Limited application of electric vibration hammer: 1. Equipment vibration excited force is greater than the same equipment, electric hammer the size and quality are great. And increase the quality of power also affected the effective use of vibration excited. 2. Using spring vibration less effective, leading to vibration excitation force along the rope higher up the transfer of energy loss, the total energy is about 15% to 25%, and ancillary lifting equipment may cause damage. 3. The frequency is low (low-frequency vibration in the hammer fall) for some of the more difficult, hard ground, especially the sand liquefaction can not make it effective, leading to difficulties pile. 4. Can not work under water, as is the motor of the drive, relatively poor water resistance. Can not be engaged in underwater operations Pulling piles. Vibratory hammer advantages: 1. Hydraulic hammer is carried by its own power station operations 2. Frequency adjustable, you can easily select the low and high frequency models. As the vibration induced force proportional to the square the size and frequency, so the same size of the hydraulic hammer and hammer vibration, the vibration excited forces are very different in size. 3. Using rubber shock vibration damping force can be used to maximize operating Pulling piles. |
Company: |
Jianhua Machinery Manufacturing Co., Ltd.
|
Contact: |
Mr. peng xiaoliang |
Address: |
Dalingshan Town Estate Management District Jianhua Yan Building, |
Postcode: |
523838 |
Tel: |
86-151-18256900 |
Fax: |
86-151-18256900 |
E-mail: |
|
|
|
|